Gate 廣場創作者新春激勵正式開啟,發帖解鎖 $60,000 豪華獎池
如何參與:
報名活動表單:https://www.gate.com/questionnaire/7315
使用廣場任意發帖小工具,搭配文字發布內容即可
豐厚獎勵一覽:
發帖即可可瓜分 $25,000 獎池
10 位幸運用戶:獲得 1 GT + Gate 鸭舌帽
Top 發帖獎勵:發帖與互動越多,排名越高,贏取 Gate 新年周邊、Gate 雙肩包等好禮
新手專屬福利:首帖即得 $50 獎勵,繼續發帖还能瓜分 $10,000 新手獎池
活動時間:2026 年 1 月 8 日 16:00 – 1 月 26 日 24:00(UTC+8)
詳情:https://www.gate.com/announcements/article/49112
Bitcoin miner Hut 8 grows hashrate 79% despite $134M quarterly loss
Cryptocurrency mining firm Hut 8 increased its hashrate by 79% during the first quarter of the year.
According to Hut8’s latest quarterly report released on May 8, the firm saw a net loss of $134.3 million despite revenue of $21.8 million. The firm’s CEO, Asher Genoot, explained that this is a result of large-scale investments.
“As reflected in our results, the first quarter was a deliberate and necessary phase of investment,” Genoot said. “We believe the returns on this work will become increasingly visible in the quarters ahead.”
Hut 8 operations reached a total energy capacity of 1,020 megawatts as of March 31, enough to power well over 800,000 average homes in the United States. The company also has the right to scale up its operation by another 2,600 MW.
Related: Bitcoin mining — Institutions boost investments amid favorable US climate
Hut 8 is scaling up operations
Genoot said the financial results follow large-scale investments by Hut 8, including upgrading the firm’s application-specific integrated circuit (ASIC) fleet and launching the majority-owned subsidiary of Hut 8, American Bitcoin.
American Bitcoin was announced at the end of March, with several members of the US President Donald Trump’s family as partners. According to the announcement, the new venture “aims to become the world’s largest, most efficient pure-play Bitcoin miner while building a robust strategic Bitcoin reserve.”
Early April reports also revealed that American Bitcoin has plans to raise additional capital, including through an initial public offering. In today’s quarterly earnings announcement, Genoot stated:
Related: Browser-based crypto mining in 2025: Still viable or virtually dead?
Future expansion plans
Talking about future plans, Hut 8’s CEO noted that the company is pushing ahead with its plans for 2025. Those include the energization of the Vega data center, the initial sitework at the River Bend data center, and the development of the firm’s utility-scale power portfolio. Genoot added:
Hut 8 stock is trading at $12.66 after seeing a 2.2% increase on the trading day on the Nasdaq. However, the stock is down by over 38% from $20.49 at the start of the year.
Magazine: AI may already use more power than Bitcoin — and it threatens Bitcoin mining